Tower Crane Dismantling Method Statement Jun 2026

Specific site address and crane position (e.g., TC1, TC2).

Finalize all "Lift Plans" and obtain local authority approvals for mobile crane placement. 2. Equipment Requirements Assist Crane: tower crane dismantling method statement

Safely release any stored energy (e.g., hydraulic pressure or tensioned cables) before disassembly. Specific site address and crane position (e

This phase is the highest risk: two cranes interact within metres of each other. The method statement mandates an exclusion zone and a single signalman with absolute authority. tower crane dismantling method statement

Skilled team performing the mechanical disassembly. 3. Equipment & Tools

Before work commences, several logistical and safety hurdles must be addressed:

Remove the remaining counterweights, then rig and lower the counter-jib. Phase C: Tower Head & Cab