Start from the ground up. Bolt the rear stabilizer and the front stabilizer to the main bottom rail. Once the base is steady, attach the vertical upright.
Starts at the leg developer/low row station, travels under the base pulleys, up through that same floating pulley, and anchors to the weight carriage.
Here is the complete assembly manual for the Treadmill.
Attach the seat support to the main upright. If your model includes a leg developer (the foam rollers at the front), install that pivot point now. Next, mount the "butterfly" or chest press arms. Ensure the bushings or plastic spacers are in place to prevent metal-on-metal grinding. 4. Phase 3: The Cable and Pulley Routing
Before turning a single bolt, the manual stresses a . The Dp Dual Trac 20 assembly manual typically lists 14 major component groups: